Design review
Building design resolves client requirements into a set of instructions for the construction of a building that satisfies those requirements. It tends to follow a relatively consistent process of project definition followed by the iterative development of an increasingly detailed solution.
It is important that regular reviews are carried out during the design process to ensure that the developing design properly reflects the client's requirements and that the design and budget do not diverge.
Design reviews are typically co-ordinated by the lead designer. They may involve the consultant team, the client, independent client advisers and where there is one, the contractor. They may also involve external organisations who specialise in undertaking design reviews.
Design reviews may consider:
- Design quality.
- Value management.
- Design risk management.
- Risks (other than health and safety risks) associated with the design, such as the use of innovative components, long lead time items and and non-standard elements of the design.
- Design co-ordination.
- Procurement route.
- Compliance with the project brief. The project brief should be amended if necessary.
- Compliance with procedures laid out in project execution plan. The project execution plan should be amended if necessary.
- Compliance with relevant legislation, circulars, guides, codes and regulations (in particular the building regulations). This may require consultation with statutory authorities such as the local planning authority, building control officers or the emergency services, who may have views on fundamental aspects of the design.
- Contingency plans.
- The feasibility, buildability, packaging, cost and programming of the design.
- Co-ordination and integration of different elements or packages of the design.
- The need for specialist designers or specialist contractors.
- The need for mock-ups, samples, tests and inspections (in the later stages of the design process it may be appropriate to visit the premises of specialist contractors or suppliers to assess samples, mock-ups and tests).
- Sustainability issues, such as: compliance with any existing client policies or targets, site selection, availability of transport, the local availability of resources and services, the local infrastructure, local ecology, landscape, energy use and energy source, flexibility and durability, waste and water management, material selection, recycling, pollution, resilience to climate change, dismantling and demolition or re-use.
- Development of site waste management plan, including opportunities to reduce consumption of resources and generation of waste.
- Assessment of protocols for submitting design information (for example building information modelling (BIM) protocols).
Following a design review, the lead designer will generally compile comments received as a and instruct the consultant team to amend or develop the design as necessary.
In some circumstances it may be appropriate to commission design reviews from independent client advisers or from specialist design review organisations. These reviews are sometimes referred to as design audits.
On public sector projects, the government requires that gateway reviews are carried out at key points during the development of the project. Gateway reviews are independent peer reviews carried out by a review team on behalf of the senior responsible owner. The review team then prepare a confidential review report for the senior responsible owner.
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- BREEAM independent party.
- Client design advisor.
- Concept design.
- Concept architectural design.
- Concept architectural design checklist.
- Crime Prevention Design Advisor.
- Detailed design.
- Design process essentials.
- Design quality.
- Design responsibility matrix.
- Design review panels.
- Design team meeting.
- Design web.
- Design risk management.
- Design workshop.
- Key performance indicators.
- Independent client advisers.
- OGC.
- Presenting to design review panels.
- Qualitative design review.
- Samples and mock-ups.
- Stakeholders.
- Stakeholder matrix.
- User panels.
- Value management.
[edit] External references
Featured articles and news
What to do with troublesome statues?
A tricky political issue.
Designing Buildings content from and for its users
Discover more on how simple and quick it is to publish an article.
Recent users articles; Timber and retrofit
Which products, for what reasons.
Recent users articles; Digitally Built Britain
ISO 19650, BIM and data management.
Recent users articles; Interim valuations and payments
Applications, notices ad points to remember.
Recent users articles; What is H-Scaffolding?
Elements, features and areas of use.
Recent users articles; what are NZEBs ?
How do they contribute to Sustainable Development.
The most viewed articles in 2022 on Designing Buildings
Written in the past 6 months, one year and beyond.
Second stairs for new tower blocks
Government launches a 12-week consultation
Happy Festive Holidays to all our users from here at DB
On the first day of Christmas DB for the Industry...
The psychological power of the built environment.
IHBC signpost update from Lords Committee on climate
Government must support behaviour change to meet targets.
Reflecting on 2022 into 2023 with the APM WiPM SIG
Women in Project Management conference 2022.
Types, colours and processing of hydrogen on DB
Grey, green, purple, blue, yellow, turquoise, brown and black.
The Kyoto Protocol a brief reminder on DB
Adopted in 1997, ratified in 2005..
Europe moves to phase out electrical SF6 gas
Sulphur hexafluoride the world’s most potent GHG.
Biomass boiler market on the rise in Europe
Proving to be a driver for decarbonisation targets.